upload
U.S. Energy Information Administration
업종: Energy
Number of terms: 18450
Number of blossaries: 0
Company Profile:
All direct and indirect costs incurred in acquiring and constructing electric utility plant and equipment and proportionate shares of common utility plants. Included are the cost of land and improvements, nuclear fuel and spare parts, allowance for funds used during construction, and general overheads capitalized, less the cost of acquiring plant and equipment previously operated in utility service.
Industry:Energy
A firm or individual that purchases products for its own consumption and not for resale (i.e., an ultimate consumer).
Industry:Energy
The gross expenditures for construction costs (including the cost of replacing worn out plants), and electric construction costs, and land held for future use.
Industry:Energy
Primary stocks of crude oil and petroleum products held in storage as of 12 midnight on the last day ofthe month. Primary stocks include crude oil or petroleum products held in storage at (or in) leases, refineries, natural gas processing plants, pipelines, tank farms, and bulk terminals that can store at least 50,000 barrels of petroleum products or that can receive petroleum products by tanker, barge, or pipeline. Crude oil that is in-transit by water from Alaska or that is stored on Federal leases or in the Strategic Petroleum Reserve is included. Primary Stocks exclude stocks of foreign origin that are held in bonded warehouse storage.
Industry:Energy
The various stages involved in the acquisition of a nuclear reactor by a utility. The events that define these stages are the ordering of a reactor, the licensing process, and the physical construction of the nuclear generating unit. A reactor is said to be "in the pipeline" when the reactor is ordered and "out of the pipeline" when it completes low power testing and begins operation toward full power.
Industry:Energy
The capacity for doing work as measured by the capability of doing work (potential energy) or the conversion of this capability to motion (kinetic energy). Energy has several forms, some of which are easily convertible and can be changed to another form useful for work. Most of the world's convertible energy comes from fossil fuels that are burned to produce heat that is then used as a transfer medium to mechanical or other means in order to accomplish tasks. Electrical energy is usually measured in kilowatthours, while heat energy is usually measured in British thermal units (Btu).
Industry:Energy
The balance shown on a utility's balance sheet for construction work not yet completed butin process. This balance line item may or may not be included in the rate base.
Industry:Energy
See Low Income Home Energy Assistance Program.
Industry:Energy
The amounts representing the exchange of services, supplies, etc., between the utility department and the municipality and its other departments without charge or at a reduced charge. Charges to this account include utility and other services, supplies, etc., furnished by the utility department to the municipality or its other departments without charge, or the amount of the reduction, if furnished at a reduced charge. Credits to the account consist of services, supplies, office space,etc., furnished by the municipality to the utility department without charge on the amount of the reduction, if furnished at a reduced charge.
Industry:Energy
A program carried out by autility company in which an auditor inspects a home and suggests ways energy can be saved.
Industry:Energy